Solutions

Covering Multiple Application Scenarios, Providing Customized Data Center Liquid Cooling Solutions

🤖

AI Data Center Liquid Cooling Solutions

30-150kW per cabinet, Responsense <100ms, PUE≤1.15, compatible with GB 200/300

CoreChallenges

  • •Single cabinet power 30-150kW
  • •GPU transient Responsense <100ms
  • •Liquid cooling system verification complexity

SolutionsFeatures

  • ✓10-1000kW liquid cooled loadbank verification
  • ✓CDU ±0.5°C Temperatureerature control
  • ✓Intelligent monitoring system
Contact Us for Details
🏦

Financial Data Center Liquid Cooling Solutions

99.999% availability, leak detection ±1m, GB50174 Class A standard

CoreChallenges

  • •99.999% availability
  • •Zero business interruption retrofit
  • •Financial compliance audit

SolutionsFeatures

  • ✓N+N/2N redundant architecture
  • ✓Distributed leak detection
  • ✓Phased construction
Contact Us for Details
🔬

Supercomputing Center Liquid Cooling Solutions

10-50MW scale, SCADA monitoring, free cooling + waste heat recovery 60%+

CoreChallenges

  • •10-50MW large scale
  • •Cooling uniformity ±1°C
  • •PUE &lt; 1.2

SolutionsFeatures

  • ✓Distributed CDU architecture
  • ✓SCADA intelligent monitoring
  • ✓Free cooling + waste heat recovery
Contact Us for Details
☁️

Edge Computing Liquid Cooling Solutions

2-hour deployment, IP54/IP55, -40°C to +55°C, 5000m altitude

CoreChallenges

  • •Wide distribution, difficult maintenance
  • •-40°C to +55°C wide temperature range
  • •4G/5G remote monitoring

SolutionsFeatures

  • ✓Factory prefabricated
  • ✓IP54/IP55 protection
  • ✓Predictive maintenance
Contact Us for Details
💧

Immersion Cooling Solutions

200-500kW per cabinet, PUE≤1.02, coolant recovery rate 99%

CoreChallenges

  • •200-500kW ultra-high density
  • •High coolant cost
  • •Operations training

SolutionsFeatures

  • ✓Single/two-phase optional
  • ✓99% coolant recovery
  • ✓TCO reduced by 40%
Contact Us for Details
🔄

Air-to-Liquid Retrofit Solutions

Zero business interruption, PUE 1.6 to 1.2, lightweight reduction 40%, ROI 2-3 years

CoreChallenges

  • •Zero business interruption
  • •Building load-bearing limits
  • •Return on investment period

SolutionsFeatures

  • ✓Phased construction
  • ✓Lightweight design
  • ✓Hybrid operation transition
Contact Us for Details

Service Process

1

Requirement Communication

Understand customer specific requirements

2

SolutionsDesign

CustomizedLiquid CoolingSolutions

3

Product Supply

Provides liquid cooling equipment

4

Installation and Commissioning

On-site installation guidance

5

Operation and Maintenance Support

ContinuousTechnology Support

Need Customized Solutions?

Our engineering team will analyze your specific needs and provide full-range services from solution design to implementation